Thursday 14 January 2016

Production Schedule #2

Jan 9 (12 to 1 O'clock)
Zombie opening scene practice shoots. Shots 1-2 (DONE)
Jan 10 (12 to 4 O'clock)
Practice shoots every shot with main actor try costume. Shots 3-32 (DONE)
Jan 17 (12 to 5 O'clock)
Film shots 1-32 . Start with shots 1-3 then 4-7,28-32 finally shots 8-27(Postpone if snow. If snow then film some shots in the snow)
Jan 23-24 (12 to 2 O'clock)
Shoot any thing missing or that needs to be re shot

1 comment:

  1. A very simple thing to do is podcasting, would really help evidence the journey

    ReplyDelete

All comments will be moderated before being posted.